Showing posts with label Activities. Show all posts
Showing posts with label Activities. Show all posts

Tuesday, June 8, 2010

Work Done 6th June

This week we went to another new forest garden to do some weeding, which was nice. Next weekend, sunday, 13th June we need to start pulling slate out of the ground. Hopefully we can find someone to flog it to so we can buy some plants!!!:-)

Monday, May 24, 2010

Work Done 23th May

Having found that the slate problem is a little worse than we thought in the forest garden we've taken a little step back and hence have turned the problem into a possible solution. We will be contacting some local garden centers next week to see if any of them would like to buy the slate off us. If any will buy it, it will mean there is a good excuse to work hard, pullin all that slate out of the ground as the money from it could be used to buy plants for the forest garden. Lovly.
We have also been siting out good places for bird/bat boxes in the woodlands and freeing some trees from Ivy (yep, we know it's great for wildlife, but there's just to darn much of it!). We have also found an amazing tree perfect for a tree house:-) And finally, we are running a raffle to fund some fruit tree budding and grafting workshops, so just email snoopyandchichi@hotmail.com if you'd like any:-)

Thursday, May 20, 2010

Work Done 16th May

Today we were able to do some more clearing; of slate and debris (roots, metal, 20 year old wellies!) in the ground and of brambles, ivy etc above ground. By digging a few test pits and having a good look we were able to work out which areas were slate and which were soil...this meand we now know where to raise the soil level. More soil was also collected from around the wall and we now have at least five good soil sifters.
Next time (Sunday, 23rd May) we will be leveling the ground and filling in the terrace. We will also be doing some more clearing and most importantly collecting and sifting more soil.
Seeya then ;-)

Monday, May 10, 2010

Work Done 9th May

It was good today and with three different groups working on three areas, alot was done. Progress was made on the wall of the walled garden, the back of the forest garden area was cleared and a huge rotted tree stump removed, and the terrace has been almost finished in the forest garden. The terrace has really changed the look of the area and given it a good bit of structure...and it dosn't just look like a mess of cardboard any more!
Next week (Sunday the 16th) we should dig some test pits, to see which bits are soil and which are slate. We will also need to do some more mulching and hopefully continue working on the terrace.
If anyone has any ideas on what can go where in the garden please put a comment up. I love ponds!!!
Cheers:-)

Tuesday, May 4, 2010

Work Done 2nd May

Today we made a start on digging out for the terrace. It's pretty hard going as the ground is full of slate, meaning that the soil dug out also is being sifted so we can use it in making the beds. We were also treated to some gorgeous nettle soup.

This Sunday, 9th May, we will be joined by a group working with us as part of their Duke of Edinburgh Award. There will also be an opportunity to work with an experienced Dry Stone Waller. Tasks for the forest garden group include; planting more trees around the tree bog, digging out the terrace, clearing the back of the garden area and mulching it.

Thursday, April 29, 2010

Work Done 25th April

The Polytunnel cover was put on; it looks brilliant and is already hotting up in there!
We will next be meeting on Sunday, 2nd May from 10.30 to continue with the forest garden project. We can start digging out for the terrace, mark out the path and beds and move the willow fence.

Tuesday, April 20, 2010

Work Done April 17th

The foraging group met and some delicious food was made from our finds. Everyone seemed to have some plant knowledge to pass on, which is why an activity like this can be so rewarding and beneficial when it's done with other people.

Food made included; Nettle soup (made the previous day); Alexander stew; Wild Garlic foccacia bread; Wild Garlic pesto; Nettle Tea; mixed wild salad (Hawthorne shoots, Dandelion leaves & petals, Lesser Celandine leaves (pre-flowering), Chickweed, young Alexander leaves, Wild Garlic and Cow Parsley leaves) and pure Dandelion salad.

This just goes to show you that nature creates it's own garden for us to harvest and the basic principles behind forest gardening involve mimicry of nature doing this.

With all the eating we didn't get much else done apart from mulching willow with lusciously smelling, partially molded leaves collected from the woodlands in winter. This should probably have been left to rot down more then used for compost mix or something better, but I'm sure the willow appreciated it all the more. The experiment with stuffing clay into the brick cracks of the cold frames has not crumbled out with drying which is good news as it means we can get on with sowing in them next weekend.

Apart form that, next Sunday, 25th April, we can meet at 11 and hopefully start work on the terrace, move the willow fence, start laying out the route of the path and possibly build another bed if we are able to collect enough soil with the volunteer team on Thursday. Also, if it's ready, we may be able to help with putting the cover on the large polytunnel, which would be great.

Tuesday, April 13, 2010

Work Done, April 11th


It was a beautiful day and a good few of us managed to get together to finish the cold frames and do some planning. The cold frames still need to be sowed in but hopefully any potential mouse problems have been delt with by using clay to stop up the gaps in the bricks...hopefully it wont all crumble out when it drys! If it does we will also be using spikey gorse twigs to deter mice.

It was great to finalise initial plans for the main construction of the garden too and a basic construction plan has been drawn up and put here and on the forum, so please feel free to print it off and scribble some ideas on it. The main issue will be getting enough soil together for the beds. The fruit tree area at the back will be cleared over the summer and autumn so we can look forward to planting in winter.

We will next be meeting on Saturday, 17th with the foraging group from 11am. In between foraging we can do some sowing in the cold frame; moving the low willow fence about 1m closer to the garden boundary and working on the terrace.

Tuesday, April 6, 2010

Work Done April 4th

Rhubarb, Strawberries, Elder, more Raspberries, Mints and other berry bush donated. Seeds also bought and donated.

It was a beautiful Easter day and we first visited a community members allotment to pick up some plants before heading over to the farm.

One mound bed constructed on top of cardboard mulch; vegetation still pretty thick under mulch which has been on for two months. Mound bed planted with strawberries which will later be moved and used as general groundcover. Slate used as edging to hold up mound bed and smaller pieces around strawberries.

A large patch of wild Gooseberries were also pointed out which had been discovered on the permaculture course the week before. Drawn plans started; a small, windy access path could go up the forest garden with keyhole style mound beds coming off it. A water source will be needed; either a pond or just small ponds of sunken sinks. The cold frames need to be finished asap. In future perhaps the cardboard mulch could be removed and instead the newspaper rolls can be used.

We will next be meeting at 1pm, Sunday 11th to finish the cold frames to sow in and do some planning. We will also hopefully do somthing about the water situation and terracing some of the garden area.

So please get in touch if you'd like to join in

:-)

Work Done In March

In Mid-March a large volunteer team came to work with growing connections on clearing for and constructing a woodland pathway and steps. Whilst clearing, the volunteers were good enough to collect the large ammounts of lovly, crumbly, dark organic matter produced by years of dead leaves. Dispite the millions of weed seeds which will also be in it, this will make an ideal compost for planting in the forest garden area.

A Willow archway and low willow fence were planted at the bottom of the garden area. Old brick toilet taken apart and cold frames started using old sash windows. Two windows are fine, one needs some of the wood repairing before we use it. Cold frames must be made higher, mulched with black plastic and made mouse proof.

Work Done In February


Hazel, Rowan, Raspberries , Comfrey, Apple tree and Elder donated.

This Sunday, Valentines Day, we managed to cardboard mulch a large area. This will kill off the couch grass within about a month to 6weeks and hopefully suppress the Ivy and Brambles to some extent too. This picture shows where the mulch has been laid; the beds will be built on top of this mulch, which will rot down over time improving the soil structure below.

The area contaminated with creosote has also been mulched and we have planted the foundations of a willow arbour through it. Some Raspberry canes, Comfrey, Rowan and Apples were also brought and will be planted soon.
This weekend we will be discussing making cold frames soon and the planting; making a rough survey of the area and planning the garden on A1 paper. We can also see about doing some more cardboard mulching if needed. One of the most important things to do though will be to collect and work out how to store as much organic matter as possible from around the farm. This will include fallen leaves from the woods.



Work Done In January

On our first day on the 7th february we cleared some of the main are of brambles using hand tools only as we deciced using tools such as strimmers was against the ethics of working a small piece of land like this in a sustainable way.

Under the vegetation we found a possible old path, slate spoils and an old chicken shed which we found had rotted and left allot of chemical creosote over about a 4m square area. We decided this area should be quarantined but that it would be an interesting side project to plant phytoremediators; plants which are used to clean-up contaminated soil (possibly alfalfa, ryegrass, willow or poplar). We will also have to be careful with what we do with the material we have removed so as not to spread contamination.

We discussed the species on the site, it was learnt that the larch cones make good fire lighters and that as the Ivy is not actually harming the Ash (other than by excluding it's light) it is not yet necessary to cut it down, especially as it is so good for wildlife. The Ash may be more of a problem in itself as they are very water and nutrient hungry trees. The Cotoneasters are also good for wildlife, particularly birds.

We also discussed mulching methods and are planning on using cardboard to suppress growth for now but also unprinted newspaper (which has been acquired) for when we come to plant. We have decided that a no-dig method is best as it will mean less disturbance to the soil structure and dormant weed seeds and no backbreaking digging! We also discussed how it would be interesting to try growing some filed scale alternative crops, such as Quinoa.